Bangladesh:Design, Supply, Installation, Testing & Commissioning of Patuakhali-Payra 230kV Transmission Line on turnkey basis

  文章来源: 阅读次数:

BangladeshDesign, Supply, Installation, Testing & Commissioning of Patuakhali-Payra 230kV Transmission Line on turnkey basis

Client: Power Grid Compony of Bangladesh Ltd (PGCB)

Scope of work: Approx. 47km 230kV double circuit transmission line, including supply and installation of 138 steel towers, 296km ACCC Twin conductors, and other materials as earth wire, OPGW, insulators and fittings, and including about 750m river crossing line. It is the first new 230kV dual-circuit transmission line using carbon fiber conductors in Bangladesh.

 

Company Profile      >

China National Cable Engineering Corporation was formerly known as “China National Electric Wire & Cable Import/Export Corporation”. The corporation is affiliated as an entity to China National Machinery Industry Corporation (referred as SINOMACH).

Contact Us       >

Add: 3rd Floor,Building Xingdongnan,Weizikeng Street No.2,Fengtai District,Beijing,China,100079.
Tel: 86 - 10–67685367
Fax: 86 - 10–84094834
Email:cccoffice@chinacables.com

Copyright 2013 www.hitux.com Hitux Network Studio All Rights Reserved

京ICP备09078613号 网站备案号:京公网安备11010502026566