homeOur BussinessElectric Power Project
Our Bussiness

Bangladesh:Supply, Installation, Testing & Commissioning of 132/33kV Substation at Barguna on Turnkey Basis.

  文章来源: 阅读次数:

Supply, Installation, Testing & Commissioning of 132/33kV Substation at Barguna on Turnkey Basis.

Client: Power Grid Compony of Bangladesh Ltd (PGCB)

Scope of work: 132 kV dual bus configuration scheme, substation equipment is air-insulated switchgear (AIS), four 132kV circuit breakers are SF6 switches, and two main transformers are 50 / 75MVA oil-immersed forced air-cooled.

Company Profile      >

China National Cable Engineering Corporation was formerly known as “China National Electric Wire & Cable Import/Export Corporation”. The corporation is affiliated as an entity to China National Machinery Industry Corporation (referred as SINOMACH).

Contact Us       >

Add: 3rd Floor,Building Xingdongnan,Weizikeng Street No.2,Fengtai District,Beijing,China,100079.
Tel: 86 - 10–67685367
Fax: 86 - 10–84094834
Email:cccoffice@chinacables.com

Copyright 2013 www.hitux.com Hitux Network Studio All Rights Reserved

京ICP备09078613号 网站备案号:京公网安备11010502026566